local case study
NetherlandsBayWa r.e.'s Dutch subsidiary Groenleven has developed and realized this project. Baywa r.e. is also undertaking the Operation Service for this project. BayWa r.e. still owns that asset and operates it as IPP.
Location | Boven Ureterp, Netherlands |
---|---|
Installed capacity | 13.7 MWp |
Commissioning date | December 2021 |
Number of modules installed | 25,000 |
Energy yield | 12,556 MWh/y |
CO2 emission reduction/y | 20,000 t |
Equivalent to the consumption of average Dutch households | Over 4,450 |
Type of installation | Floating-PV |